Dimensional inspection and metrology.

Inspection is integral to manufacturing — not a checkpoint after the fact. We use Zeiss CMM, Faro arm, and optical comparator data to support first article, in-process, and final inspection on production parts.

All in-house materials
Inspection & Metrology — precision machined work at Northline
Inspection & Metrology — precision machined work at Northline
Typical tolerance
±0.0005”
Working envelope
Project-specific — confirm at RFQ
Machine platforms
Zeiss Contura CMM · Faro Quantum Arm
Production
Prototype → production

Overview

What this process is for.

  • Zeiss Contura CMM for precision dimensional verification.

  • Faro Quantum Arm for portable inspection of larger or fixtured parts.

  • Keyence optical comparator for profile and feature verification.

  • First Article Inspection support and documentation on request.

Process at a glance

Working envelope
Project-specific — confirm at RFQ
Tolerances
Project-specific · confirmed at RFQ
Inspection
CMM · Faro arm · optical
Quality system
ISO 9001:2015 · ITAR

Equipment

Machines used for this work.

  • Zeiss Contura CMM
  • Faro Quantum Arm
  • Keyence optical comparator

Materials

Materials supported on this process.

  • All in-house materials

Applications

Typical part types and uses.

  • First Article Inspection
  • In-process dimensional verification
  • Final inspection on critical features
  • Fixture and assembly verification

Tolerances & quality

How we hold and verify the part.

CMM inspection of a precision-machined component
Zeiss Contura CMM · Metrology bayISO 9001:2015

Tolerance approach

Inspection plans built from drawing GD&T callouts; reviewed at RFQ for production programs.

View tolerance standards

Quality & documentation

  • CMM reports available on request
  • First Article Inspection support
  • Material certifications and traceability available

FAQ

Engineering FAQs

The questions engineering and procurement teams ask most often before a first quote.

Do you provide CMM reports with parts?

On request. Standard production parts ship with the documentation specified in the customer's quality requirements.

Can you support AS9102 First Article Inspection?

Yes — First Article Inspection support is available. Northline does not currently hold AS9100 certification.

Do you have ITAR-compliant data handling?

Yes. Northline is ITAR registered and handles controlled data per program requirements.

Quote Inspection & Metrology

Have a part ready for inspection & metrology?

Upload your CAD files or drawings — our engineering team reviews and responds within one business day.