First Article Inspection that qualifies the part.

First Article Inspection is the bridge between an approved drawing and a qualified production process. We document the part the way procurement teams need to qualify their supplier.

First Article Inspection on a granite plate with CMM probe and inspection report
First Article Inspection on a granite plate with CMM probe and inspection report

Process

How a first article is run.

  1. Step 01

    Plan

    Inspection plan built from drawing GD&T and customer requirements.

  2. Step 02

    Manufacture

    First article produced with documented setup and tooling.

  3. Step 03

    Verify

    Dimensional verification on Zeiss CMM, Faro arm, or comparator as appropriate.

  4. Step 04

    Document

    FAI report with measurement results, material certs, and CoC on request.

  5. Step 05

    Approve

    Submitted to customer for sign-off before production release.

Deliverables

What's included in the FAI package.

  • AS9102-style FAI report (Forms 1–3 as applicable)
  • Dimensional measurement results
  • Material certifications and traceability
  • Certificate of Conformance
  • CMM raw data on request

FAQ

FAI FAQs

The questions engineering and procurement teams ask most often before a first quote.

Do you provide AS9102 FAIs?

We provide AS9102-style First Article Inspection documentation suitable for flowdown into AS9100-certified primes. Northline does not currently hold AS9100 certification.

What's the lead time on a first article?

Lead time depends on the part — discuss expectations at the RFQ stage. We plan FAIs as part of the production schedule.

Can you do FAIs on customer-supplied parts?

We focus on FAIs for parts we manufacture. Third-party inspection is outside our standard scope.

Start a project

Have a part ready for review?

Upload your CAD files or drawings and our engineering team will review the project requirements.